Bexar County / San Antonio /

SAT Campus

Proposed · decisions still openCloudHQ · Record updated 2026-11-26

Draft record. This page has not yet been checked line by line against the source documents. Treat it as a lead, not a citation.

A planned five-building CloudHQ data center campus on 123.4 acres at Texas Research Park, the former University of Texas Health Science Center laboratory site, outside the San Antonio city limits. The UT System sold the land in May 2023. CloudHQ advertises 3,023,300 square feet and 600 MW of critical IT load with multiple on-site substations; no building registration or environmental permit was found as of November 2026.

Where this stands and what you can do

No final local approval is on record. This is when residents have the most say: hearings and votes on annexation, zoning, tax breaks and utility agreements are still ahead.

  1. Ask for conditions before any vote. A city or county that is asked for annexation, zoning, utilities or a tax break can attach terms: a water cap with annual reporting, noise limits, setbacks from homes, limits on generator testing hours. Ask for them in writing and ask that the draft agreement be posted before the vote.

    Contact: San Antonio City Council · how to speak or comment

    A letter you can copy: ask for conditions before a vote

    Send to: Mayor and council members. Fill in the brackets, cut what does not apply, and say it in your own words where you can. A short letter from a neighbor carries more weight than a form.

    Subject: SAT Campus - conditions before any vote
    
    Dear Mayor and Council Members,
    
    I live in [neighborhood / street] and I am writing about SAT Campus (CloudHQ).
    
    I am not asking you to turn away investment. I am asking that no annexation, zoning change, utility agreement or tax abatement for this project be approved until the following are written into the ordinance or the agreement itself:
    
    1. Water: a cap on annual water use, stated in acre-feet, with a yearly public report of actual use.
    2. Noise: a limit measured at the property line, and set hours for testing backup generators.
    3. Distance: a minimum setback and a buffer between the buildings, the generators and the nearest homes.
    4. Power: disclosure of any on-site power plant or generators, and the air permits they will need.
    5. Money: any tax abatement tied to a minimum investment, a jobs and wage floor, and a clawback if those are missed.
    6. Transparency: the draft agreement posted publicly at least [14] days before the vote.
    
    Please tell me which of these the current draft includes, and when the public will be able to read it.
    
    Thank you,
    [Name]
    [Address]
    [Phone or email]
  2. Speak or write on the tax abatement. A tax abatement is a choice, not an obligation. Ask the body considering one to deny it, shorten it, or tie it to jobs, wages and a clawback if promises are missed.

    Contact: Bexar County Commissioners Court

    A letter you can copy: comment on a tax abatement

    Send to: The body considering the abatement (city council or commissioners court). Fill in the brackets, cut what does not apply, and say it in your own words where you can. A short letter from a neighbor carries more weight than a form.

    Subject: Tax abatement for SAT Campus
    
    Dear [Mayor and Council Members / Judge and Commissioners],
    
    I am writing about the tax abatement requested for SAT Campus (CloudHQ).
    
    A tax abatement is your decision to make; state law does not require one. Before you vote, I ask that you:
    
    1. State publicly the percentage, the number of years, and the dollar value of the taxes that would be forgiven.
    2. Compare the request with what other Texas cities and counties have granted for similar projects.
    3. Require a minimum investment, a minimum number of full-time jobs at a stated wage, and repayment if those terms are not met.
    4. Require an annual compliance report, posted publicly.
    5. Explain what San Antonio and Bexar County receive in return, and when.
    
    If these terms cannot be met, I ask that you vote no.
    
    Thank you,
    [Name]
    [Address]
  3. Comment on state permits. Backup generators and on-site power plants need air authorizations from the state environmental agency. Some types take public comment; all can be the subject of a complaint.

    Contact: TCEQ: comment on a pending permit · TCEQ: environmental complaint

  4. Ask for the documents. The agreement, the application and the studies are public records. Request them now, while they can still inform a vote.

    Contact: How to file a public information request

  5. Ask the state for rules that apply everywhere. Outside city limits, Texas counties have little power over what gets built. Changing that takes the Legislature.

    Contact: Who Represents Me (Texas Legislature) · Office of the Texas Governor

    A letter you can copy: write to your state senator and representative

    Send to: Your Texas state senator and state representative. Fill in the brackets, cut what does not apply, and say it in your own words where you can. A short letter from a neighbor carries more weight than a form.

    Subject: Data center siting and reporting standards - Bexar County
    
    Dear [Senator / Representative] [Name],
    
    I am your constituent in Bexar County, where SAT Campus (CloudHQ) is [proposed / being built / operating] near homes.
    
    I support data centers being built in Texas. My concern is where and how fast. Outside city limits, counties have almost no say, and neighbors learn the terms after the vote. I ask that you support legislation that would:
    
    1. Give counties authority to set reasonable siting standards for large data centers: setbacks from homes and schools, noise limits, and limits on on-site power generation near neighborhoods.
    2. Require data centers above a set size to report their water and electricity use each year, publicly.
    3. Require that tax abatement and development agreements with data centers be posted before the vote, not after.
    4. Require air permits and pollution controls to be in place before on-site turbines and generators run.
    
    Please tell me your position on these, and whether a bill addressing them is filed or planned.
    
    Thank you,
    [Name]
    [Address - so your office can confirm I am a constituent]

This is general information about how local and state decisions get made, not legal advice.Who decides what, and every contact and letter in one place.

Legal entities
Walan Ventures LLC
Also known as
CloudHQ SAT1-SAT5; CloudHQ San Antonio; Former UT Health Science Center site, Texas Research Park
Location
15355 Lambda Dr and 14930-14960 Omicron Dr, Texas Research Park, between Lambda Drive and Omicron Drive across from Microsoft's campus (some listings give 15255 Lambda Dr)
Jurisdiction
Outside the San Antonio city limits, in the city's extraterritorial jurisdiction in unincorporated Bexar County. The appraisal district lists Bexar County, Northside ISD and Bexar County Emergency Services District 2 among the taxing units, and not the City of San Antonio. A 2023 city plat memo for a neighboring tract says zoning does not apply outside the city limits.
Site
123.4 acres
Power
600 MW
Investment
No figure has been published. The University of Texas System declined to give the sale price (San Antonio Report, 2023-05-10). The appraisal district's 2026 values for the nine parcels total about $32 million, most of it the former laboratory buildings.

Documents and sources

26 items: Government records (9) · Appraisal district records (9) · News and company statements (8)

Government records

Ordinances, resolutions, agreements, notices, permits and filings.

DateDocumentFromLink
2026-03-12PUC Docket 58276 filings list: CPS Energy Omicron 138 kV transmission line
Application filed 2025-06-27, proposal for decision 2025-12-05, Commission order 2026-03-12. Intervenors are individuals and landowner entities; CyrusOne, QTS and CloudHQ do not appear among the filers.
Public Utility Commission of TexasOpen
2025-06-27Application to amend a certificate of convenience and necessity, Omicron 138 kV transmission line
Places the Omicron Substation about 0.35 miles west of Potranco Road (FM 1957) and State Highway 211. Estimated cost $40,042,000 to $64,832,000 depending on route; construction January to November 2027.
CPS EnergyOpen
2023-05-01Board of Regents authorization and deed for the sale of the Texas Research Park tract
Not yet obtained. Known from the San Antonio Report (2023-05-10), which cites the sale by the Board of Regents and site plans attached to Bexar County property records.
University of Texas SystemNot yet archived. Have it?
Bexar County parcel map service (owner and address query)
Queried by owner name and street. The nine Walan Ventures LLC parcels total 123.36 acres. 15355 Lambda Dr is the address of the Walan Ventures parcels (and of an unrelated 4-acre convenience store lot); the CyrusOne tract on Lambda Drive is a separate parcel with no street number.
Bexar CountyOpen
TDLR project search for CloudHQ and Lambda Drive
Checked November 2026: no building registration under CloudHQ, and none for this site among Lambda Drive or Omicron Drive projects.
Texas Department of Licensing and RegulationOpen
TCEQ Central Registry search, Bexar County
Checked November 2026: no regulated entity under CloudHQ or Walan. The only entries at these addresses are older ones for the former research tenants.
Texas Commission on Environmental QualityOpen
Omicron New 138kV Transmission Line Project page
A five-mile 138 kV line to a new Omicron Substation in far west Bexar County, needed for "increasing customer load growth in the area, including new large customer loads." No customer is named. ERCOT endorsed the project 2024-07-26; the Public Utility Commission selected Route 26 on 2026-03-12.
CPS EnergyOpen
Qualifying data center and large data center lists
Checked November 2026: no entry.
Texas ComptrollerOpen
Chapter 312 abatement agreement registry (statewide data file)
Checked November 2026: no Bexar County or City of San Antonio agreement with CloudHQ or Walan Ventures.
Texas ComptrollerOpen

Appraisal district records

The county appraisal district page for each parcel: owner, value, deed history.

DateDocumentFromLink
Bexar Appraisal District property 201232
51.07 acres, CB 4348A Block 2 Lot 3 and adjoining tracts, Lambda Dr. Owner of record: Walan Ventures LLC, 1212 New York Ave NW, Suite 1000, Washington, DC. No improvements. 2026 appraised value $1,075,000.
Bexar Appraisal DistrictOpen
Bexar Appraisal District property 201219
27.8845 acres, CB 4348 P-10 ABS 1001, 15355 Lambda Dr. Owner of record: Walan Ventures LLC, 1212 New York Ave NW, Suite 1000, Washington, DC. No improvements. 2026 appraised value $800,000.
Bexar Appraisal DistrictOpen
Bexar Appraisal District property 201220
15.43 acres, CB 4348 P-11 ABS 1001, 15355 Lambda Dr. Owner of record: Walan Ventures LLC, 1212 New York Ave NW, Suite 1000, Washington, DC. Four buildings totaling about 128,700 square feet. 2026 appraised value $17,500,000.
Bexar Appraisal DistrictOpen
Bexar Appraisal District property 201225
10.66 acres, CB 4348 P-13 ABS 1001, 14930 Omicron Dr. Owner of record: Walan Ventures LLC, 1212 New York Ave NW, Suite 1000, Washington, DC. No improvements. 2026 appraised value $415,000.
Bexar Appraisal DistrictOpen
Bexar Appraisal District property 201233
7.1845 acres, CB 4348B Block 2 Lot 1 and P-12B, 14960 Omicron Dr. Owner of record: Walan Ventures LLC, 1212 New York Ave NW, Suite 1000, Washington, DC. Buildings of 37,628 and 10,942 square feet; business name on the account is "Former UT Health Science Center". 2026 appraised value $6,875,000.
Bexar Appraisal DistrictOpen
Bexar Appraisal District property 201229
6.68 acres, CB 4348A Block 1 Lot 1 (UTIBT Subdivision Unit 1), 15355 Lambda Dr. Owner of record: Walan Ventures LLC, 1212 New York Ave NW, Suite 1000, Washington, DC. A 38,892-square-foot building. 2026 appraised value $4,868,000.
Bexar Appraisal DistrictOpen
Bexar Appraisal District property 201223
1.7429 acres, CB 4348 P-12A ABS 1001, 14960 Omicron Dr. Owner of record: Walan Ventures LLC, 1212 New York Ave NW, Suite 1000, Washington, DC. No improvements. 2026 appraised value $250,000.
Bexar Appraisal DistrictOpen
Bexar Appraisal District property 201276
1.64 acres, CB 4349D Block 4 Lot 11 (Texas Research Park Unit 1F), 14785 Omicron Dr. Owner of record: Walan Ventures LLC, 1212 New York Ave NW, Suite 1000, Washington, DC. 2026 appraised value $105,000.
Bexar Appraisal DistrictOpen
Bexar Appraisal District property 201222
1.067 acres, CB 4348 P-12 ABS 1001, 14960 Omicron Dr. Owner of record: Walan Ventures LLC, 1212 New York Ave NW, Suite 1000, Washington, DC. No improvements. 2026 appraised value $150,000.
Bexar Appraisal DistrictOpen

News and company statements

Reporting and press releases. These are not public records; they are context and leads.

DateDocumentFromLink
2023-08-31Denver data center company buys 89 acres on far West Side
Places Vantage's purchase immediately east of the CloudHQ plot and repeats that site plans show four or five data centers.
San Antonio ReportRead
2023-06-07CloudHQ purchases over 120 acres in San Antonio, Texas.BaxtelRead
2023-05-10Cluster of data centers on West Side continues to grow
The UT System Board of Regents sold the 123.4-acre plot to CloudHQ; a UT Health spokesman said the labs moved to the South Texas Medical Center in 2022 and declined to give the price. CloudHQ did not respond to a request for comment.
San Antonio ReportRead
2023-05-10CloudHQ Scoops 123 Acres Near Microsoft Data Center in San Antonio
Cites the San Antonio Business Journal; says a county filing suggests a four- or five-story building.
The Real DealRead
CloudHQ acquires more than 120 acres of land in San Antonio, Texas
Not opened: the site returned a bot check. The link and summary come from a search result.
Data Center DynamicsRead
CloudHQ: SAT1 (tracker listing)
Lists the site as a land bank at 15355 Lambda Dr; no building had started construction by November 2026.
BaxtelRead
CloudHQ: San Antonio SAT Campus (tracker listing)BaxtelRead
SAT Campus
Company campus page: 3,023,300 square feet, 600 MW total critical IT load in five planned data centers, "RFS within 2027", multiple on-site substations, on the former University of Texas Health Science Center site.
CloudHQOpen

Timeline

  1. Public Utility Commission of Texas. Approved a route for CPS Energy's Omicron 138 kV transmission line, which CPS says is needed for load growth in the area "including new large customer loads." No customer is named. Source
  2. San Antonio Report. Reported Vantage Data Centers' purchase of UT System land immediately east of the CloudHQ tract. Source
  3. University of Texas System Board of Regents. Sold the 123.4-acre plot to CloudHQ; the appraisal district's deed history dates the special warranty deed 2023-05-01. Price not disclosed. Site plans attached to county property records showed four or five data centers. Source

See an error or have a document that belongs here? Tell us.