Wilson County / Stockdale /

Misae Energy Hub

Proposed · decisions still openMisae Investments · Record updated 2026-11-26

Draft record. This page has not yet been checked line by line against the source documents. Treat it as a lead, not a citation.

A proposed 500 MW data center with a solar farm and a gas-fired power plant on about 2,742 acres of the former Mojo Ranch north of Stockdale. The developer, Misae Investments, says it will not be the final operator and targets 2028. TCEQ issued an air standard permit for on-site power generation in January 2026; sources give different sizes for the gas plant and disagree on whether construction has started.

Where this stands and what you can do

No final local approval is on record. This is when residents have the most say: hearings and votes on annexation, zoning, tax breaks and utility agreements are still ahead.

  1. Ask for conditions before any vote. A city or county that is asked for annexation, zoning, utilities or a tax break can attach terms: a water cap with annual reporting, noise limits, setbacks from homes, limits on generator testing hours. Ask for them in writing and ask that the draft agreement be posted before the vote.

    Contact: Stockdale City Council

    A letter you can copy: ask for conditions before a vote

    Send to: Mayor and council members. Fill in the brackets, cut what does not apply, and say it in your own words where you can. A short letter from a neighbor carries more weight than a form.

    Subject: Misae Energy Hub - conditions before any vote
    
    Dear Mayor and Council Members,
    
    I live in [neighborhood / street] and I am writing about Misae Energy Hub (Misae Investments).
    
    I am not asking you to turn away investment. I am asking that no annexation, zoning change, utility agreement or tax abatement for this project be approved until the following are written into the ordinance or the agreement itself:
    
    1. Water: a cap on annual water use, stated in acre-feet, with a yearly public report of actual use.
    2. Noise: a limit measured at the property line, and set hours for testing backup generators.
    3. Distance: a minimum setback and a buffer between the buildings, the generators and the nearest homes.
    4. Power: disclosure of any on-site power plant or generators, and the air permits they will need.
    5. Money: any tax abatement tied to a minimum investment, a jobs and wage floor, and a clawback if those are missed.
    6. Transparency: the draft agreement posted publicly at least [14] days before the vote.
    
    Please tell me which of these the current draft includes, and when the public will be able to read it.
    
    Thank you,
    [Name]
    [Address]
    [Phone or email]
  2. Speak or write on the tax abatement. A tax abatement is a choice, not an obligation. Ask the body considering one to deny it, shorten it, or tie it to jobs, wages and a clawback if promises are missed.

    Contact: Wilson County Commissioners Court

    A letter you can copy: comment on a tax abatement

    Send to: The body considering the abatement (city council or commissioners court). Fill in the brackets, cut what does not apply, and say it in your own words where you can. A short letter from a neighbor carries more weight than a form.

    Subject: Tax abatement for Misae Energy Hub
    
    Dear [Mayor and Council Members / Judge and Commissioners],
    
    I am writing about the tax abatement requested for Misae Energy Hub (Misae Investments).
    
    A tax abatement is your decision to make; state law does not require one. Before you vote, I ask that you:
    
    1. State publicly the percentage, the number of years, and the dollar value of the taxes that would be forgiven.
    2. Compare the request with what other Texas cities and counties have granted for similar projects.
    3. Require a minimum investment, a minimum number of full-time jobs at a stated wage, and repayment if those terms are not met.
    4. Require an annual compliance report, posted publicly.
    5. Explain what Stockdale and Wilson County receive in return, and when.
    
    If these terms cannot be met, I ask that you vote no.
    
    Thank you,
    [Name]
    [Address]
  3. Comment on state permits. Backup generators and on-site power plants need air authorizations from the state environmental agency. Some types take public comment; all can be the subject of a complaint.

    Contact: TCEQ: comment on a pending permit · TCEQ: environmental complaint

  4. Ask for the documents. The agreement, the application and the studies are public records. Request them now, while they can still inform a vote.

    Contact: How to file a public information request

  5. Ask the state for rules that apply everywhere. Outside city limits, Texas counties have little power over what gets built. Changing that takes the Legislature.

    Contact: Who Represents Me (Texas Legislature) · Office of the Texas Governor

    A letter you can copy: write to your state senator and representative

    Send to: Your Texas state senator and state representative. Fill in the brackets, cut what does not apply, and say it in your own words where you can. A short letter from a neighbor carries more weight than a form.

    Subject: Data center siting and reporting standards - Wilson County
    
    Dear [Senator / Representative] [Name],
    
    I am your constituent in Wilson County, where Misae Energy Hub (Misae Investments) is [proposed / being built / operating] near homes.
    
    I support data centers being built in Texas. My concern is where and how fast. Outside city limits, counties have almost no say, and neighbors learn the terms after the vote. I ask that you support legislation that would:
    
    1. Give counties authority to set reasonable siting standards for large data centers: setbacks from homes and schools, noise limits, and limits on on-site power generation near neighborhoods.
    2. Require data centers above a set size to report their water and electricity use each year, publicly.
    3. Require that tax abatement and development agreements with data centers be posted before the vote, not after.
    4. Require air permits and pollution controls to be in place before on-site turbines and generators run.
    
    Please tell me your position on these, and whether a bill addressing them is filed or planned.
    
    Thank you,
    [Name]
    [Address - so your office can confirm I am a constituent]

This is general information about how local and state decisions get made, not legal advice.Who decides what, and every contact and letter in one place.

Legal entities
Misae Investments; Misae Gas Power LLC; Misae Solar Parks
Also known as
Mojo Ranch project; Mojo energy hub; North America Data Center (NADC); Mojo Solar; Wilson BESS; MISAE WILSON DC 500MW; Wilson Gas Plant (ERCOT 28INR0494); Misae Wilson Power Plant
Location
Former Mojo Ranch, about six to seven miles north of Stockdale on County Road 428, just off Highway 123. TCEQ address: 1892 County Road 428, Stockdale, TX 78160.
Jurisdiction
Unincorporated Wilson County, outside Stockdale city limits. The Stockdale Economic Development Corp. board president said on 2026-03-05 that the board has limited authority because the site is outside the city and on private land. No Wilson County Commissioners Court agenda in 2026 carries an item on the project.
Site
2,742 acres
Power
500 MW
Water
Sources disagree. Spectrum News (2025-11-28) reported that Misae's website said permits to pump up to 2 million gallons per day had been approved, while an Evergreen Underground Water Conservation District representative said no new permits had been filed for the project. Search excerpts of later Wilson County News coverage say the website was changed to estimate average use of up to 15,000 gallons per day. No Misae application appears on the district's permit hearing notices from April through November 2026.

Documents and sources

52 items: Government records (16) · Meetings (11) · Appraisal district records (1) · News and company statements (24)

Government records

Ordinances, resolutions, agreements, notices, permits and filings.

DateDocumentFromLink
2026-08-21Summary of proposed rule amendments, side by side, for the August 21, 2026 public hearing
District-wide rules, which cover Wilson County: monitoring wells and continuous real-time production reporting for permits for power generation and data or computing centers. The board approved the amendments unanimously on 2026-08-21.
Evergreen Underground Water Conservation DistrictOpen
2026-03-09Wilson County Tax Abatement Policy, March 9, 2026
Twelve-page scanned Chapter 312 policy, approved after a public hearing on 2026-03-09. Minimum investment $1,000,000 for a new business; an application must precede the start of a project. Does not mention data centers.
Wilson County Commissioners CourtOpen
2026-01-14Air New Source Registration 182518 (standard permit), Misae Gas Power LLC
Status active. Held by Misae Gas Power LLC as owner-operator since 2025-12-18; mailing address on Cedar Springs Road, Dallas. No enforcement, complaint or investigation entries.
Texas Commission on Environmental QualityOpen
2026-01-14Air permits project record 402344: standard permit new registration, MISAE WILSON DC 500MW
Received 2025-12-18, issued 2026-01-14, renewal 2036-01-14. Rule 6005, electric generating facilities. Expedited permitting; two deficiency cycles in January 2026. The record does not state megawatts or the number of engines.
Texas Commission on Environmental QualityOpen
2025-12-18Standard permit registration file for 182518 (application, emission calculations, issuance letter)
Not yet obtained. The Texas Tribune describes it as 206 gas generators totaling 519 MW; a search excerpt of other coverage gives 206 engines totaling 518.7 MW. The file would settle the permitted size.
Texas Commission on Environmental QualityNot yet archived. Have it?
Central Registry: regulated entity RN112340302, MISAE WILSON DC 500MW
Primary business: power generation for data center. 1892 County Road 428, Stockdale, Wilson County. Owner-operator Misae Gas Power LLC (CN606460897). One air new source registration, 182518, active.
Texas Commission on Environmental QualityOpen
ERCOT generation interconnection status report entry 28INR0494, Wilson Gas Plant
Not obtained from ERCOT. Third-party copies of the queue show 402.88 MW gas (internal combustion), interconnecting entity Misae Gas Power, Wilson County, tap on the Elm Creek to San Miguel 345 kV circuits 1 and 2, projected completion 2028-06-30.
ERCOTNot yet archived. Have it?
Wilson Gas Plant, 28INR0494
Copy of the ERCOT queue from the October 2026 report: screening study started 2026-03-10 and completed 2026-06-04, full interconnection study requested 2026-03-24, no interconnection agreement.
ERCOTQueue.comOpen
ERCOT 28INR0494 Wilson Gas Plant
Copy of the ERCOT queue: 402.88 MW, queue date 2026-03-10, proposed completion 2028-06-30, active.
interconnection.fyiOpen
Wilson Gas Plant
Tracker copy of the ERCOT queue entry. Not opened in this pass.
CleanviewOpen
Evergreen UWCD public permit hearing notices, April through November 2026
The eight permit hearing notices posted for April 24 through November 17, 2026 were read. None lists an application by Misae or for the County Road 428 site.
Evergreen Underground Water Conservation DistrictOpen
Misae Energy Hub project page
The page at misaesolar.com returned not found on 2026-11-27. Spectrum News (2025-11-28) reported that it claimed approved permits for up to 2 million gallons of water per day; search excerpts say it listed 2028 for Mojo Solar, Wilson BESS and the data center, and later described a single campus with a data center, on-site solar and a gas plant using up to 15,000 gallons per day on average.
Misae InvestmentsNot yet archived. Have it?
Pipeline Projects
Company page. Lists the North America Data Center (NADC), a hyperscale data center for AI training in Wilson County with a 2028 target, and Mojo Solar, 525 MWac / 650 MWdc with site control secured, as the parts of Misae Energy Hub. Investor confidential. No gas plant, acreage or water figure.
Misae InvestmentsOpen
Protect Wilson County Water petition
Residents' petition asking Commissioners Court to review abatements and development agreements for such projects, named by WOAI on 2026-02-20 at protectwilsoncountywater.com. The site returned not found on 2026-11-27. A search excerpt says 1,385 verified county residents signed in under five days.
Protect Wilson County WaterNot yet archived. Have it?
Misae Wilson Power Plant
Wiki tracker entry. The page refused automated access; a search excerpt says it lists about 519 MW in pre-construction with a planned 2028 start.
Global Energy MonitorOpen
Misae Energy Hub (Mojo Ranch Project)
Tracker entry listing the project as under construction, citing only the WOAI story; says its details have not been checked against the source.
More Than Just Parks data center trackerOpen

Meetings

Every public meeting where the project came up: agenda, minutes and recording.

DateDocumentFromLink
2026-08-21Minutes, Evergreen UWCD Board of Directors regular meeting, August 21, 2026
Scanned. Resolution 2026-08-04 and the rule amendments approved unanimously.
Evergreen Underground Water Conservation DistrictOpen
2026-08-10Agenda, Commissioners Court regular meeting, August 10, 2026
Carries an item on the Wilson County Economic Development Corporation contract. No data center item.
Wilson County Commissioners CourtOpen
2026-08-10Recording: 8-10-26, Wilson County Commissioners Court
County livestream. Not viewed; timestamps were not located.
Wilson CountyWatch
2026-06-22Agenda, Commissioners Court regular meeting, June 22, 2026
No data center item. Item 3 is public comments.
Wilson County Commissioners CourtOpen
2026-06-22Recording: 6-22-26, Wilson County Commissioners Court
County livestream. Not viewed; public comment timestamps were not located.
Wilson CountyWatch
2026-03-09Agenda, Commissioners Court regular meeting, March 9, 2026
10:00 a.m. public hearing on the tax abatement policy and an item to approve the revised policy.
Wilson County Commissioners CourtOpen
2026-03-05Stockdale Economic Development Corp. agenda and minutes, March 5, 2026
Not obtained. The meeting is known from Wilson County News coverage.
Stockdale Economic Development Corp.Not yet archived. Have it?
2026-02-23Agenda, Commissioners Court regular meeting, February 23, 2026
Item setting a public hearing on changes to the tax abatement policy for March 9. No data center item.
Wilson County Commissioners CourtOpen
2026-01-26Agenda, Commissioners Court regular meeting, January 26, 2026
Public hearing on changes to the Wilson County Tax Abatement Policy and an item to adopt the revised policy.
Wilson County Commissioners CourtOpen
Wilson County Commissioners Court agendas, 2026
All 34 agendas posted from 2026-01-12 through 2026-11-23 were searched. None names Misae, Mojo Ranch or a data center. Solar items concern other projects (Clear Fork Creek Solar, Moon Stone Solar).
Wilson County Commissioners CourtOpen
Minutes, Wilson County Commissioners Court, June 22 and August 10, 2026
Not found on the county website, which posts agendas and links to recordings.
Wilson County Commissioners CourtNot yet archived. Have it?

Appraisal district records

The county appraisal district page for each parcel: owner, value, deed history.

DateDocumentFromLink
Wilson County Appraisal District property record, 1892 County Road 428
Not obtained. The district's property search sits behind a reCAPTCHA check, which was not bypassed. No parcel number or record owner appears in any source read.
Wilson County Appraisal DistrictNot yet archived. Have it?

News and company statements

Reporting and press releases. These are not public records; they are context and leads.

DateDocumentFromLink
2026-04-07Wilson County citizens need to unite (letter)
Letter to the editor replying to the founder interview. Date from the audio edition.
Wilson County NewsRead
2026-03-24Resident: 'Rural life threatened' by data center
Profile of a family whose property adjoins the site, described as a combined AI data center, solar farm and gas plant; says the view from the property changed in May 2025. Date and summary from the audio edition.
Wilson County NewsRead
2026-03-24Resident: 'Rural life threatened' by data center (audio edition)
Audio edition and show notes of the same article.
Wilson County NewsRead
2026-03-24Data center: We don't want this here (letter)
Letter to the editor from an adjoining property owner. Date from the audio edition.
Wilson County NewsRead
2026-03-24Data centers threaten Wilson County's future (letter)
Letter to the editor. Date from the audio edition.
Wilson County NewsRead
2026-03-17Data centers: No benefit for Wilson County (letter)
Letter to the editor replying to the founder interview. Date from the audio edition.
Wilson County NewsRead
2026-03-17Wilson County residents deserve responsible development (letter)
Letter to the editor urging residents to join the Wilson County Resource Preservation Project. Date from the audio edition.
Wilson County NewsRead
2026-03-11Misae founder aims to alleviate data center project concerns
Interview with founder Dr. Miguel Oneto. The page refused automated access. Print date from letters that cite it.
Wilson County NewsRead
2026-03-10Misae founder aims to alleviate data center project concerns (audio edition)
Show notes: site about six miles north of Stockdale on C.R. 428; Misae Investments has offices in Dallas and Boca Raton, Florida; Oneto says the company is a developer, not the final operator.
Wilson County NewsRead
2026-03-10Stockdale EDC hears public concerns on data center proposal
March 5 Stockdale Economic Development Corp. meeting. The page refused automated access; details from the audio edition.
Wilson County NewsRead
2026-03-10Stockdale EDC hears public concerns on data center proposal (audio edition)
Show notes: water use and transparency dominated; the board president said the board has limited authority outside city limits.
Wilson County NewsRead
2026-02-25Wilson County residents: Protect our water
The page refused automated access. Search excerpts say about 150 residents attended a February meeting, that the article calls the project currently under construction, and that it quotes an official saying no permits had been drawn and no one from the project had come before the county development review board. Date from a letter that cites it.
Wilson County NewsRead
2026-02-20Wilson County residents fight proposed AI data center
Describes a 2,700-acre AI data center and renewable energy farm north of Stockdale off Highway 123; says trees had been bulldozed, groundbreaking was expected soon and operation was expected in 2028. More than 140 people attended a Stockdale meeting; names the group Protect Wilson County Water and its petition.
WOAI News 4 San AntonioRead
2026-02-03In the West Texas oil patch, companies plan gas power plants to run new data centers (reprint)
Reprint of the Texas Tribune article.
Route FiftyRead
2026-02-03Texas Data Centers to Rely on Gas Power Plants (reprint)
Reprint of the Texas Tribune article: 133 tons per year of particulate matter and 10 tons per year of formaldehyde authorized.
Insurance JournalRead
2026-02-02In the West Texas oil patch, companies plan gas power plants to run new data centers
Published with Inside Climate News. Says Misae Gas Power applied on Dec. 23 for 206 gas generators totaling 519 MW at a data center outside San Antonio and that TCEQ granted the permit on Jan. 14. The article does not name the county; the TCEQ issue date matches registration 182518. Read through reprints.
The Texas TribuneRead
2025-11-28Residents worry data center could drain aquifer
Reports the website's 2 million gallons per day claim, the Evergreen UWCD statement that no new permits had been filed, and two commissioners saying the county had no formal information. Misae did not respond before publication.
Spectrum News 1Read
2025-11-04AI data center is coming to Wilson County (company repost)
Listed on the company news page under Misae Energy Hub; not opened.
Misae InvestmentsOpen
2025-11-04AI data center is coming to Wilson County
First report: 2,742 acres; Mojo Solar plus battery storage on 2,170 acres, Wilson BESS on 18 acres, 500 MW hyperscale data center. The article page refused automated access; details from the paper's audio edition.
Wilson County NewsRead
2025-11-04AI data center is coming to Wilson County (audio edition)
Audio edition and show notes of the same article.
Wilson County NewsRead
Wilson County residents fight proposed AI data center (Fox San Antonio copy)
Sister-station copy of the WOAI story, cited by a tracker; not opened.
KABB Fox San AntonioRead
'Very healthy water supply'
Seen in search results alongside coverage of the project; not opened and not dated.
Wilson County NewsRead
Residents urge Wilson County to demand transparency and safeguards for data centers and other industrial projects
AI-generated summary of public comment at the June 22, 2026 Commissioners Court meeting. The page refused automated access; details from a search excerpt.
Citizen PortalRead
Data centers pop up in comments on county EDC
Coverage of the August 10, 2026 Commissioners Court meeting, where speakers opposed data center expansion and the Economic Development Corp. contract. Seen in search results; not opened and publish date not confirmed.
Wilson County NewsRead

Timeline

  1. ERCOT. Screening study started for interconnection request 28INR0494, Wilson Gas Plant, 402.88 MW gas, interconnecting entity Misae Gas Power, tapping both Elm Creek to San Miguel 345 kV circuits, projected in service 2028-06-30. A full interconnection study was requested 2026-03-24 and the screening study was completed 2026-06-04; no interconnection agreement was shown as of the October 2026 report. Source
  2. Misae Investments. Founder Dr. Miguel Oneto told the Wilson County News that the company is a developer and not the final operator. Source
  3. Wilson County Commissioners Court. Public hearing and agenda item to approve a revised Wilson County Tax Abatement Policy; the posted policy says it was approved that day. The policy does not mention data centers. No abatement application for this project was found. Source
  4. Stockdale Economic Development Corp.. The board heard residents on the proposal for the first time; water use and transparency were the main concerns. Board President J.C. Hrubetz said the board has limited authority because the site is outside city limits. No action reported. Source
  5. Protect Wilson County Water. More than 140 people attended a residents' meeting in Stockdale about the project, according to WOAI. The group circulated a petition. Source
  6. Texas Commission on Environmental Quality. Issued standard permit registration 182518 to Misae Gas Power LLC; renewal date 2036-01-14. The Texas Tribune reported that it authorizes emissions including 133 tons per year of particulate matter and 10 tons per year of formaldehyde. Source
  7. Texas Commission on Environmental Quality. Received a standard permit registration (No. 182518, electric generating facilities) from Misae Gas Power LLC for MISAE WILSON DC 500MW at 1892 County Road 428, with expedited permitting. The Texas Tribune gives the application date as December 23 and the size as 206 gas generators totaling 519 MW. Source
  8. Wilson County commissioners. Commissioners Jeffery Pierdolla and John Akin told Spectrum News the county had received no formal information about the project, that it would be the county's first data center, and that the county could not deny it outright. Source
  9. Wilson County News. First local report of the project: Misae Energy Hub on 2,742 acres near Stockdale, made up of Mojo Solar plus battery storage on 2,170 acres, Wilson BESS on 18 acres, and a 500 MW hyperscale data center. Source

See an error or have a document that belongs here? Tell us.