Rowan Digital Infrastructure
Rowan Digital Infrastructure is a Denver-based company that develops data center campuses for large technology companies. It is owned by Quinbrook Infrastructure Partners, with Blackstone funds holding a minority stake since April 2026. In Texas it is building in Medina County near Lytle and in Temple.
- Also known as
- Rowan; Rowan Digital; Rowan Digital Infrastructure LLC; RDI; Rowan Cinco LLC; Rowan Land Resources LLC; Rowan Lytle LLC; Rowan Stampede LLC
- Type
- Hyperscale data center developer
- Headquarters
- Denver, Colorado
- Ownership
- A portfolio company of Quinbrook Infrastructure Partners, which says it founded Rowan. Funds affiliated with Blackstone bought what the April 2026 announcement called a "significant minority stake"; the trade publication IREI put it at 49 percent, a figure the announcement does not give. Sources disagree on the founding year: Quinbrook's website says 2022, and IREI says 2020.
- Elsewhere in Texas
- Beyond the two Lytle-area sites in Medina County (Project Cinco and Project Pirate), Rowan is building in Temple, Bell County, under the names Project Temple, Project Stampede and Project Ranger. KXXV reported six data centers there in all, at least $4.2 billion of combined investment and at least 120 full-time jobs; Bisnow reported $3 billion of debt financing for a 300 MW Temple campus in May 2026. End customers on the public record: the Texas Comptroller's data center registry lists Google LLC as an operator at Project Cinco, and a Maryland regulator's letter says Amazon Data Services applied for the air permit at Rowan's Bauxite I site in Frederick, Maryland.
- Website
- rowan.digital
Legal entities named in the records: Crux Cinco Tenant, LLC; Rowan Cinco LLC; Rowan Land Resources LLC; Rowan Lytle LLC. Search for these names, not only the company name, in agendas and appraisal records.
2 documented projects
- Project CincoUnder construction · local approvals done
A 300 MW data center campus on about 440 acres just outside Lytle. The state data center registry names Google LLC as an operator. Medina County and the City of Lytle each approved an 80 percent, 10-year tax abatement (the county's covers its maintenance and operations tax only). The city council voted down a sewer service agreement for the site in October 2026 and approved a revised one in November 2026.
- Project PirateProposed · decisions still open
A second Rowan data center site of about 284 acres next to Lytle. Annexation, industrial rezoning and a second reinvestment zone went to public hearing in October 2026, and the planning and zoning commission recommended denying the rezoning. The council has discussed it only in executive session since; no abatement terms have been stated on the record.
On the record
- Rowan Stampede LLC filed a complaint against ERCOT at the Public Utility Commission of Texas (Docket 60396), challenging ERCOT's reclassification of its Temple project from base load to studied load in the Batch Zero large load process and ERCOT's denial of its dispute. The outcome was not checked. Source
- Frederick, Maryland: the Maryland Department of the Environment wrote to Rowan that site visits had confirmed construction on emissions units (concrete foundations for diesel emergency generators, electrical conduit and transformers) at the Bauxite I data center site before a final air permit was issued. The letter required that work to stop until a permit was issued and said failure to comply would result in a violation. It notes the permit application on file was from Amazon Data Services, not Rowan. No later enforcement action was found. Source
- Temple, Texas (2026): KXXV reported that a residents' group, Temple Stands Together, protested Rowan's projects and called for a moratorium on data centers as Rowan sought approval for a sixth building, the Lasso Building. Rowan's vice president of economic development said the company moved the building because the city needed the original land for its landfill, and the report says its Temple buildings use closed-loop cooling. The page shows no publication date; it was written before planning hearings set for August and September 2026. Source
Sources on the company
| Date | Source | From | Link |
|---|---|---|---|
| 2026-10-14 | PUC Docket 60396: Complaint of Rowan Stampede LLC against ERCOT | Public Utility Commission of Texas (copy hosted by ERCOT) | Open |
| 2026-05-29 | Colorado Developer Secures $3B For Data Center Campus North Of Austin | Bisnow | Open |
| 2026-04-10 | Kirkland Advises Quinbrook on Strategic Recapitalization of Rowan Digital Infrastructure | Kirkland & Ellis | Open |
| 2025-12-31 | Letter to Rowan Digital re: emissions unit construction activity prior to issuance of air permit, Bauxite I Data Center | Maryland Department of the Environment, Air and Radiation Administration | Open |
| 2025-09-11 | Texas data center registry entry: Cinco Data Center | Texas Comptroller | Open |
| Rowan Digital Infrastructure Announces Strategic Recapitalization | Rowan Digital Infrastructure (republished by Barchart) | Open | |
| Blackstone acquires 49% stake in Rowan Digital Infrastructure | Institutional Real Estate, Inc. | Open | |
| Rowan Digital Infrastructure (portfolio page) | Quinbrook Infrastructure Partners | Open | |
| Rowan Digital Infrastructure pursues final planned data center in Temple amid community opposition | KXXV (25 News) | Open | |
| Rowan files for second building at data center campus in Temple, Texas | Data Center Dynamics | Open | |
| Letter to Gov. Abbott from Rowan CEO Charley Daitch | Rowan Digital Infrastructure | Open |