Rowan Digital Infrastructure is a Denver-based company that develops data center campuses for large technology companies. It is owned by Quinbrook Infrastructure Partners, with Blackstone funds holding a minority stake since April 2026. In Texas it is building in Medina County near Lytle and in Temple.

Also known as
Rowan; Rowan Digital; Rowan Digital Infrastructure LLC; RDI; Rowan Cinco LLC; Rowan Land Resources LLC; Rowan Lytle LLC; Rowan Stampede LLC
Type
Hyperscale data center developer
Headquarters
Denver, Colorado
Ownership
A portfolio company of Quinbrook Infrastructure Partners, which says it founded Rowan. Funds affiliated with Blackstone bought what the April 2026 announcement called a "significant minority stake"; the trade publication IREI put it at 49 percent, a figure the announcement does not give. Sources disagree on the founding year: Quinbrook's website says 2022, and IREI says 2020.
Elsewhere in Texas
Beyond the two Lytle-area sites in Medina County (Project Cinco and Project Pirate), Rowan is building in Temple, Bell County, under the names Project Temple, Project Stampede and Project Ranger. KXXV reported six data centers there in all, at least $4.2 billion of combined investment and at least 120 full-time jobs; Bisnow reported $3 billion of debt financing for a 300 MW Temple campus in May 2026. End customers on the public record: the Texas Comptroller's data center registry lists Google LLC as an operator at Project Cinco, and a Maryland regulator's letter says Amazon Data Services applied for the air permit at Rowan's Bauxite I site in Frederick, Maryland.
Website
rowan.digital

Legal entities named in the records: Crux Cinco Tenant, LLC; Rowan Cinco LLC; Rowan Land Resources LLC; Rowan Lytle LLC. Search for these names, not only the company name, in agendas and appraisal records.

2 documented projects

On the record

Lawsuits, violations, fines and disputes reported about this company, each with its source. An allegation is described as one; it is not a finding.

  1. Rowan Stampede LLC filed a complaint against ERCOT at the Public Utility Commission of Texas (Docket 60396), challenging ERCOT's reclassification of its Temple project from base load to studied load in the Batch Zero large load process and ERCOT's denial of its dispute. The outcome was not checked. Source
  2. Frederick, Maryland: the Maryland Department of the Environment wrote to Rowan that site visits had confirmed construction on emissions units (concrete foundations for diesel emergency generators, electrical conduit and transformers) at the Bauxite I data center site before a final air permit was issued. The letter required that work to stop until a permit was issued and said failure to comply would result in a violation. It notes the permit application on file was from Amazon Data Services, not Rowan. No later enforcement action was found. Source
  3. Temple, Texas (2026): KXXV reported that a residents' group, Temple Stands Together, protested Rowan's projects and called for a moratorium on data centers as Rowan sought approval for a sixth building, the Lasso Building. Rowan's vice president of economic development said the company moved the building because the city needed the original land for its landfill, and the report says its Temple buildings use closed-loop cooling. The page shows no publication date; it was written before planning hearings set for August and September 2026. Source

Sources on the company

DateSourceFromLink
2026-10-14PUC Docket 60396: Complaint of Rowan Stampede LLC against ERCOT
Identifies Rowan Stampede LLC as a subsidiary of Rowan Digital Infrastructure LLC and places Project Stampede in Bell County, with an interconnection request through Oncor (Batch Zero number BZ-117). The megawatt figure is illegible in the scanned copy.
Public Utility Commission of Texas (copy hosted by ERCOT)Open
2026-05-29Colorado Developer Secures $3B For Data Center Campus North Of Austin
$3 billion of debt financing for a 300 MW campus in Temple. Paywalled after the first paragraph; lenders not read.
BisnowOpen
2026-04-10Kirkland Advises Quinbrook on Strategic Recapitalization of Rowan Digital Infrastructure
Funds affiliated with Blackstone acquired a "significant minority stake" in Rowan, a Quinbrook portfolio company. No percentage or price.
Kirkland & EllisOpen
2025-12-31Letter to Rowan Digital re: emissions unit construction activity prior to issuance of air permit, Bauxite I Data Center
Two-page stop-work request for emissions-unit construction at 3250 Digital Drive, Frederick. Addressed to Rowan's Denver office.
Maryland Department of the Environment, Air and Radiation AdministrationOpen
2025-09-11Texas data center registry entry: Cinco Data Center
Owner Rowan Cinco LLC, occupant Crux Cinco Tenant, LLC, operator Google LLC. Cited from this site's Project Cinco record.
Texas ComptrollerOpen
Rowan Digital Infrastructure Announces Strategic Recapitalization
The company announcement of the Blackstone investment. Seen in search results; not opened.
Rowan Digital Infrastructure (republished by Barchart)Open
Blackstone acquires 49% stake in Rowan Digital Infrastructure
The only source found for the 49 percent figure. Also says Rowan is Denver-based, was founded in 2020 as a Quinbrook portfolio company, and that Quinbrook keeps operational control.
Institutional Real Estate, Inc.Open
Rowan Digital Infrastructure (portfolio page)
Describes Rowan as a platform Quinbrook founded in 2022, with more than 20 sites and a flagship campus, Bauxite, in Frederick, Maryland. The page gives both 5.8+ GW and "over 5 GW under evaluation".
Quinbrook Infrastructure PartnersOpen
Rowan Digital Infrastructure pursues final planned data center in Temple amid community opposition
Names the Temple projects, gives the $4.2 billion and 120-job figures and quotes both the residents' group and Rowan. Undated; describes planning hearings set for August and September 2026.
KXXV (25 News)Open
Rowan files for second building at data center campus in Temple, Texas
Seen in search results; not opened.
Data Center DynamicsOpen
Letter to Gov. Abbott from Rowan CEO Charley Daitch
Company letter posted in August 2026, the month the governor ordered an audit of data center grid requests. Seen in search results; not opened.
Rowan Digital InfrastructureOpen