Medina County / Castroville /

Medina County Data Center (SAT14)

Under construction · local approvals doneCyrusOne · Record updated 2026-11-26

Draft record. This page has not yet been checked line by line against the source documents. Treat it as a lead, not a citation.

A CyrusOne data center campus on about 244.3 acres along US 90 west of Castroville, next to Microsoft's US 90 site. Medina County designated the land a reinvestment zone in September 2025 and approved an 80 percent, 10-year county tax abatement in November 2025; CyrusOne paid the county $5 million toward County Road 4516. The first building, SAT14A, is under construction, and state records list three notices of violation in 2026 under the construction stormwater permit held by the contractor, PCL Construction Services, Inc., all shown as resolved.

Where this stands and what you can do

The main local decisions have been made and building has started. It is too late to stop this phase. What remains is holding the builder to its permits and agreements, and shaping any later phase or new request.

  1. Report problems as they happen. Dust, mud on roads, runoff, noise and night work are covered by state stormwater and air rules and by local agreements. A dated complaint to the state environmental agency creates a record that is investigated.

    Contact: TCEQ: comment on a pending permit · TCEQ: environmental complaint

  2. Ask that the agreements be enforced. Tax abatement and development agreements carry conditions and reporting duties. Ask the city or county for the compliance reports and what it is doing to check them.

    Contact: Castroville City Council

    A letter you can copy: ask how the agreements are being enforced

    Send to: City administrator or county judge, with a copy to your council member or commissioner. Fill in the brackets, cut what does not apply, and say it in your own words where you can. A short letter from a neighbor carries more weight than a form.

    Subject: Medina County Data Center (SAT14) - compliance with its agreements
    
    Dear [Name],
    
    I live near Medina County Data Center (SAT14) (CyrusOne). The project has agreements with [the city / the county] that carry conditions. I would like to know how they are being checked. Please tell me:
    
    1. Which agreements are in force (tax abatement, development agreement, utility service, road use), and where the signed copies can be read.
    2. What the company must report each year, and whether those reports have been received.
    3. Who on staff is responsible for checking compliance, and what happens if a term is missed.
    4. How a resident should report a problem at the site (noise, dust, traffic, water), and to whom.
    
    If this is easier to answer as a public information request, please treat it as one under Government Code chapter 552.
    
    Thank you,
    [Name]
    [Address]
  3. Watch for the next request. Later phases, annexation, more water or sewer, and new abatements each come back for a vote. That is where terms can still be set.

    Contact: Medina County Commissioners Court · how to speak or comment

    A letter you can copy: write to the commissioners court

    Send to: County judge and commissioners. Fill in the brackets, cut what does not apply, and say it in your own words where you can. A short letter from a neighbor carries more weight than a form.

    Subject: Data center development in Medina County - Medina County Data Center (SAT14)
    
    Dear Judge and Commissioners,
    
    I live in Medina County near Medina County Data Center (SAT14) (CyrusOne).
    
    I understand the county's power over land use outside city limits is limited. I am asking you to use the authority you do have:
    
    1. Grant no tax abatement or other incentive without a public hearing, published terms, and a clawback.
    2. Use the court's control over county roads to make sure the builder, not county taxpayers, pays for damage from construction traffic.
    3. Apply the county's subdivision, drainage and fire code rules in full, and say publicly which apply to this site.
    4. Post every agreement with a data center developer on the county website.
    5. Ask our state legislators for the authority counties need to set reasonable standards for projects of this size.
    
    Please let me know when the court will next take up an item involving this project.
    
    Thank you,
    [Name]
    [Address]
  4. Ask for the documents. Signed agreements, permits and inspection reports are public records.

    Contact: How to file a public information request

  5. Ask the state and federal governments for standards. Rules on siting, water reporting, on-site power and air pollution are made in Austin and Washington, not at city hall.

    Contact: Who Represents Me (Texas Legislature) · Office of the Texas Governor

    A letter you can copy: write to your state senator and representative

    Send to: Your Texas state senator and state representative. Fill in the brackets, cut what does not apply, and say it in your own words where you can. A short letter from a neighbor carries more weight than a form.

    Subject: Data center siting and reporting standards - Medina County
    
    Dear [Senator / Representative] [Name],
    
    I am your constituent in Medina County, where Medina County Data Center (SAT14) (CyrusOne) is [proposed / being built / operating] near homes.
    
    I support data centers being built in Texas. My concern is where and how fast. Outside city limits, counties have almost no say, and neighbors learn the terms after the vote. I ask that you support legislation that would:
    
    1. Give counties authority to set reasonable siting standards for large data centers: setbacks from homes and schools, noise limits, and limits on on-site power generation near neighborhoods.
    2. Require data centers above a set size to report their water and electricity use each year, publicly.
    3. Require that tax abatement and development agreements with data centers be posted before the vote, not after.
    4. Require air permits and pollution controls to be in place before on-site turbines and generators run.
    
    Please tell me your position on these, and whether a bill addressing them is filed or planned.
    
    Thank you,
    [Name]
    [Address - so your office can confirm I am a constituent]

This is general information about how local and state decisions get made, not legal advice.Who decides what, and every contact and letter in one place.

Legal entities
CyrusOne LP; CyrusOne LLC
Also known as
SAT14; SAT14A; CyrusOne SAT 14; CyrusOne Reinvestment Zone 1, Medina County, Texas; Castroville SAT14 campus
Location
3397 US Hwy 90 W, about 3.75 miles west of Castroville, between US 90 and County Road 4516 (Quihi-Castroville Road)
Jurisdiction
Unincorporated Medina County, Commissioner Precinct 2, west of the Castroville city limits. The county's stormwater system (MS4) is the one named on the state construction permit; no City of Castroville action on the site was found.
Site
244.3 acres
Investment
The county agreement requires at least $600 million of assessed value in the first two data centers and at least $300 million for each data center (Medina County, 2025-11-03). The state building registration lists $500 million for the first building, SAT14A (TDLR, 2026-07-16). CyrusOne's project page gives about $4 billion to $6 billion across multiple phases (read 2026-11-26).
Water
CyrusOne's project page says each building is expected to use about 1,100 gallons a day on average with closed-loop cooling, and that the initial cooling fill will be delivered to the site rather than drawn from local supplies (read 2026-11-26). The Express-News reported the closed-loop system takes about 50,000 gallons to fill (2026-08-17).

Tax incentives

Granted byTermsDate
Medina County Commissioners CourtChapter 312 agreement with CyrusOne LP: 80% abatement of county maintenance and operations taxes for 10 years on each data center's real property and on each personal property phase; the farm-to-market and debt service levies are not abated. Requires $600 million of assessed value in the first two data centers, $300 million per data center, 40 full-time jobs at 120% of the county average wage by the fifth year after the first completion certificate, and a $5,000,000 payment by 2025-12-31 for County Road 4516.2025-11-03

Documents and sources

45 items: Government records (19) · Meetings (11) · Appraisal district records (1) · News and company statements (14)

Government records

Ordinances, resolutions, agreements, notices, permits and filings.

DateDocumentFromLink
2026-08-12Air new source registration 184983
Active; held by CyrusOne LLC since 2026-08-12. The registry page gives no equipment list. Baxtel reports the registration covers 168 diesel generators of 2.25 MW and six house generators for the first two buildings; that count was not confirmed in a state record.
Texas Commission on Environmental QualityOpen
2026-08-12Air new source registration 184983, project list
One project, number 413308, type initial, completed 2026-08-12.
Texas Commission on Environmental QualityOpen
2026-07-24Notices of violation under permit TXR1567XB
Three notices to permit holder PCL Construction Services, Inc., all moderate and resolved: 2026-04-27, stormwater plan not implemented before construction began; 2026-07-24, nuisance dust; 2026-07-24, dust creating a traffic hazard.
Texas Commission on Environmental QualityOpen
2026-07-21STEC Medina County Load Project (25RPG046), ERCOT independent review status update
Regional transmission plan that adds about 980 MW of new South Texas Electric Cooperative load near Castroville and a new Alsatian station serving loads named Rodgers and Edwards. The document does not name CyrusOne. CyrusOne's project page says its campus is reviewed by Medina Electric Cooperative and STEC.
ERCOTOpen
2026-07-16TABS2026025457, SAT14A
Owner CyrusOne LP; design firm Corgan. One-story insulated precast building, 460,000 square feet, $500,000,000, start 2026-01-12, completion 2027-06-01, tenant not assigned, status Review Complete.
Texas Department of Licensing and RegulationOpen
2026-04-14Investigations under permit TXR1567XB
Compliance investigations dated 2026-03-04 and 2026-04-14.
Texas Commission on Environmental QualityOpen
2026-03-18Water quality complaints under permit TXR1567XB
Tracking numbers 453936 (received 2026-02-27, closed 2026-03-05) and 454927 (received 2026-03-18, closed 2026-03-19).
Texas Commission on Environmental QualityOpen
2026-01-22Construction stormwater authorization TXR1567XB
Active. 235 acres disturbed, part of a common plan of development, receiving water Nueces River Basin segment 2108, estimated project dates 2026-02-09 to 2028-06-05. Coordinates 29.349111, -98.952037.
Texas Commission on Environmental QualityOpen
2025-11-03Chapter 312 Agreement between Medina County, Texas and CyrusOne LP
Covers about 244.3 acres in Precinct 2, designated CyrusOne Reinvestment Zone 1. 80% of county taxes for 10 years per data center and per personal property phase; a Building is defined as up to 250,000 square feet and two stories. Exhibit A describes three tracts of 148.8, 14.349 and 81.152 acres; the 81.152-acre tract fronts County Road 4516. Exhibit H (public access road) is to be attached later. Exhibit I requires stakeholder meetings, a project website and a public open house.
Medina CountyOpen
2025-10-14Large Load Information handout
General terms for large loads on the cooperative's system, including a 9 to 12 month study for loads of 75 MW or more. Names no project.
Medina Electric CooperativeOpen
2025-09-22Notice of public hearing regarding the designation of CyrusOne Reinvestment Zone 1
Printed in the 2025-09-22 agenda packet with the site map and legal descriptions. Describes the zone as about 3.75 miles west of Castroville between US 90 and CR 4516.
Medina CountyOpen
2025-09-22Order designating CyrusOne Reinvestment Zone 1
Adopted 4-0 per the minutes, which say the order is attached; the signed order was not found as a separate file.
Medina County Commissioners CourtNot yet archived. Have it?
2024-12-09Order establishing Chapter 312 guidelines and criteria (County Order No. 24-12-09-01)
The agreement cites this order as its authorizing order. Linked from the county's Economic Development page; not opened.
Medina CountyOpen
Economic Development page (index of county incentive agreements)
Lists the agreement as "CyrusOne Reinvestment Zone 1, Medina County, Texas".
Medina CountyOpen
TCEQ RN112357884, CYRUSONE SAT 14
Regulated entity record for the construction site, about 3 miles west of US 90 and FM 1343 on the north side of US 90. Operator PCL Construction Services Inc.; one authorization, stormwater permit TXR1567XB.
Texas Commission on Environmental QualityOpen
TCEQ RN112507629, SAT14
Regulated entity record with primary business "data center". Owner and operator CyrusOne LLC; one authorization, air new source registration 184983. Matched to this site by the name SAT14, the county and the nearest city; the location description on the record is not specific.
Texas Commission on Environmental QualityOpen
Chapter 312 abatement registry (abatement detail file)
Checked 2026-11-26: no row for the 2025 Medina County agreement with CyrusOne. The only Medina County abatement row is a 2019 solar agreement.
Texas ComptrollerOpen
Chapter 312 abatement registry (reinvestment zone detail file)
Checked 2026-11-26: no row for CyrusOne Reinvestment Zone 1.
Texas ComptrollerOpen
Data center registry
Checked 2026-11-26: no entry for SAT14, C1 Medina or a CyrusOne site in Medina County.
Texas ComptrollerOpen

Meetings

Every public meeting where the project came up: agenda, minutes and recording.

DateDocumentFromLink
2026-10-02Commissioners Court agenda packet
Holds the draft 2026-09-08 minutes and a fund report showing fund 068, Data Centers, at $5,133,825.83.
Medina County Commissioners CourtOpen
2026-09-08Commissioners Court agenda
Budget and tax rate hearings.
Medina County Commissioners CourtOpen
2026-09-08Commissioners Court minutes
A resident asked about budget line 68, Data Center, $5,117,000. Judge Lutz said it is the $5 million received from CyrusOne for County Road 4516. In a later hearing Commissioner Sittre put the cost of rebuilding Quihi Road from Castroville to Quihi at about $22 million.
Medina County Commissioners CourtOpen
2025-11-03Commissioners Court agenda
Item 15, Chapter 312 tax abatement agreement with CyrusOne LP over approximately 245 acres.
Medina County Commissioners CourtOpen
2025-11-03Commissioners Court agenda packet
565 pages. Holds the agreement as presented for the vote.
Medina County Commissioners CourtOpen
2025-11-03Commissioners Court minutes
Agreement approved 4-0 on a motion by Commissioner Lynch, second by Commissioner Sittre.
Medina County Commissioners CourtOpen
2025-09-22Commissioners Court agenda
Item 9, designation of CyrusOne Reinvestment Zone 1; item 10, public hearing on a possible Chapter 312 agreement with CyrusOne LP.
Medina County Commissioners CourtOpen
2025-09-22Commissioners Court agenda packet
489 pages. Holds the hearing notice, site map, legal descriptions and the draft agreement.
Medina County Commissioners CourtOpen
2025-09-22Commissioners Court minutes
Zone designated 4-0 on a motion by Commissioner Sittre, second by Commissioner Castiglione. Hearing on the agreement opened 9:07 a.m. and closed 9:29 a.m. after several resident comments and questions to the county's attorney.
Medina County Commissioners CourtOpen
2025-07-14Commissioners Court agenda
Executive session on economic development negotiations, then possible action.
Medina County Commissioners CourtOpen
2025-07-14Commissioners Court minutes
Authorized Judge Lutz to negotiate a memorandum of understanding with CyrusOne LP on a Chapter 312 agreement. Motion by Commissioner Jessica Castiglione, second by Commissioner Larry Sittre, 3-0.
Medina County Commissioners CourtOpen

Appraisal district records

The county appraisal district page for each parcel: owner, value, deed history.

DateDocumentFromLink
Medina CAD property records for the three tracts (148.8, 14.349 and 81.152 acres)
Parcel numbers were not found. The tracts are described in Exhibit A of the agreement. Baxtel reports the owner as C1 Medina II LLC, with purchases in April and November 2025; that was not checked against a deed or the appraisal roll.
Medina County Appraisal DistrictNot yet archived. Have it?

News and company statements

Reporting and press releases. These are not public records; they are context and leads.

DateDocumentFromLink
2026-10-06Texas data center pause isn't stopping construction of facilities, including one just outside San Antonio
Reports SAT14A proceeding during the governor's pause on state environmental permits for data centers.
San Antonio CurrentRead
2026-10-02Can small-group tours of data centers change hearts and minds?
Describes the Castroville-area site as 250 acres of former ranch and farmland next to a Microsoft data center, with completion expected in June. Photo shows the construction site behind homes on US 90.
San Antonio ReportRead
2026-08-17How One Data Center Company Plans to Earn Texans' Trust
Says CyrusOne is building a substation and transmission and distribution systems for the Castroville project, a $500 million, 460,000-square-foot building due in June 2027.
San Antonio Express-News (via Government Technology)Read
2025-11-05County approves 80 % tax break for new data center project
Judge Lutz forecast $78.9 million for the county and other taxing entities in the first decade and said the abatement covers the maintenance and operations rate only.
Devine NewsRead
2025-10-01Cyrus One... County schedules action on 80% tax abatement supporting another new data center proposal
Describes a $600 million facility with a 500,000-square-foot building and calls it the eighth data center proposed or under construction in the county. Quotes a speaker at the hearing asking about the $5 million.
Devine NewsRead
2025-07-16Medina commissioners okay 2nd school officer to protect Lytle campuses
Reports the 3-0 vote after a closed session to let Judge Lutz negotiate with a group "identified only as Cyrus".
Devine NewsRead
CyrusOne announces sixth data center campus in San Antonio, Texas
Page refused automated requests; not read. Search summaries describe it as a report on the SAT14A state filing.
Data Center DynamicsRead
Data center operator pursuing $500M San Antonio-area facility
Page refused automated requests; not read.
Connect CRERead
Medina County, TX data center campus page
Read 2026-11-26. States a $4 billion to $6 billion investment across phases, about 1,100 gallons of water a day per building, power through dedicated transmission paid for by CyrusOne, and dust controls used during grading.
CyrusOneOpen
CyrusOne Castroville SAT14 campus
Tracker page. Gives the land history under C1 Medina II LLC and the generator count attributed to registration 184983.
Baxtel (tracker)Read
CyrusOne: Castroville SAT14A
Tracker page. Says mass grading began in spring 2026 and the structure was rising by September 2026.
Baxtel (tracker)Read
CyrusOne: Castroville SAT14B
Tracker page for a planned second building; no size or schedule.
Baxtel (tracker)Read
Data Centers in Medina County, TX
Tracker page with a dated log of county and state records for this site.
Texas Data Center Watch (tracker)Read
SAT14A Castroville Campus
Tracker page; lists the project as proposed.
More Than Just Parks (tracker)Read

Timeline

  1. Medina County Commissioners Court. During the budget hearing, Judge Lutz said the county's roughly $5.1 million Data Center fund is the $5 million received from CyrusOne about 45 days after the agreement was signed, requested for repairs to County Road 4516. Source
  2. Texas Commission on Environmental Quality. Air new source registration 184983 for the site (entity name SAT14) became active, held by CyrusOne LLC. Source
  3. Texas Commission on Environmental Quality. Two notices of violation to the same permit holder, PCL Construction Services, Inc., for dust: failure to prevent nuisance conditions, and failure to prevent traffic hazard conditions from dust that impeded the flow of traffic. Both classified moderate; status resolved. Source
  4. Texas Department of Licensing and Regulation. CyrusOne LP registered building SAT14A: a one-story, 460,000-square-foot building at 3397 US Hwy 90 W, estimated cost $500,000,000, start 2026-01-12, completion 2027-06-01, no tenant assigned. Source
  5. Texas Commission on Environmental Quality. Notice of violation to the stormwater permit holder, contractor PCL Construction Services, Inc.: failed to implement the Stormwater Pollution Prevention Plan before beginning construction. Classified moderate; status resolved. Source
  6. Texas Commission on Environmental Quality. First of two water quality complaints received about the site (closed 2026-03-05). A second was received 2026-03-18 and closed the next day. Compliance investigations are dated 2026-03-04 and 2026-04-14. Source
  7. Texas Commission on Environmental Quality. Construction stormwater coverage TXR1567XB began for the site, held by contractor PCL Construction Services, Inc.: 235 acres disturbed, estimated start 2026-02-09, estimated end 2028-06-05. Source
  8. Medina County Commissioners Court. Approved the Chapter 312 tax abatement agreement with CyrusOne LP over approximately 245 acres in the zone (4-0; motion by Commissioner David Lynch, second by Commissioner Larry Sittre). Source
  9. Medina County Commissioners Court. Designated CyrusOne Reinvestment Zone 1, about 244.3 acres on US 90 west of the Castroville city limits (4-0). A public hearing on the proposed abatement agreement ran from 9:07 to 9:29 a.m. with several comments from residents. Source
  10. Medina County Commissioners Court. After an executive session on economic development negotiations, authorized County Judge Keith Lutz to negotiate a memorandum of understanding with CyrusOne LP on the principal terms of a Chapter 312 agreement (3-0, one commissioner absent). Source